Skip To Content
Lumberg GroundbreakingArvada Students at groundbreakingWTS RenderingK Lakes GroundbreaakingArvada HallwayKlakes designArvada Gym

in the NEWS

Celebrating the Past, Present, and Future of Prospect Valley
Added: October 06, 2021
Mini Miners donned their shovels and hard hats to break ground on their new school ...
Read More About Celebrating the Past, Present, and Future of Prospect Valley
clear
The Final Push of Summer 2021 Construction
Added: July 27, 2021
The Jeffco Construction Team is working hard to get summer projects ready for the start of school ...
Read More About The Final Push of Summer 2021 Construction
clear

LATEST VIDEOs

Flipbook 2020

covid-19 response - indoor air quality

Spring 2020 - Spring 2021

  • Used 100% outside air to condition our spaces whenever possible, as we have historically done.
  • Doubled or significantly increased the amount of fresh air provided on winter and summer days when we could not use 100% outside air (starting March 2020).
  • Ran building fans one hour before school start and ½ hour after finish to flush the buildings (March 2020)
  • Increased HVAC filter efficiencies from MERV 8 to MERV 10 or 11 (higher filter efficiencies are detrimental to systems not designed for them) (starting Spring 2020).
  • Checked the CO2 levels in classrooms in every school in the district to ensure proper indoor air quality (Upon student return in April 2021).
  • Researched and eliminated many air disinfection systems based on potential danger or poor value to the district including in-classroom HEPA systems (February 2020 - Ongoing).
  • Piloted an Ultraviolet Air Disinfection system to ensure value to the district (December 2020 – March 2021).

School Year 2021 -  2022

  • Continue using 100% fresh air to ventilate when outside air temps are pleasant.

  • Continue increased fresh air ratios when outside air must be conditioned.

  • Continue to run fans before and after school to flush our buildings.

  • Continue using the more efficient air filters.

  • Continue to sample CO2 levels in classrooms across the district.

  • Continue to monitor new technologies and guidelines for Indoor Air Quality.

  • Implement installation of Ultraviolet Air Disinfection equipment inside of HVAC equipment across the district.

HOW THE MONEY IS SPENT

jEFFCO

The Bond Program allows us to provide our students and educators safe, high-quality learning environments.

Specifically, Jeffco Public Schools will use these funds to:
  • Add and expand career/technical education facilities.
  • Upgrade safety and security equipment in school buildings.
  • Repair, renovate, equip, and reconstruct buildings to ensure our schools are safe, efficient and accessible to all students, including those with disabilities.
  • Construct, furnish, equip, and support needs in buildings and classrooms at all schools in the district, including charter schools.

FIND YOUR SCHOOL

See what changes are coming to your school!

FCI = Facility Condition Index
This is a measurement of the physical condition of the school's interior, exterior and grounds.

FCI scale
web banner background image
Website by SchoolMessenger Presence. © 2021 Intrado Corporation. All rights reserved.